Global Edison is often asked what does it take to develop a power plant project. The specifics will vary with the fuel, demand, owners and local requirements among many other things.
The Security Package forms the basis of the loan for the project. The most important thing to remember is that many if not all of the elements of a Security Package will need to be developed in parallel at the same time.
In the Security Package document examples below Cavalier Energy is the Special Purpose Vehicle (SPV) formed to own the project. The country is Pakistan, the fuel is LNG and the demand is base load to serve the National Grid and specifically Karachi, the largest incorporated city in the world that was without reliable electricity for 20 hours a day.